$Date: 2004/08/10 18:12:46 $
This example requires :
This example will run a polygonal (rectangle 15x3) ProgressBar filled in reverse way.
Cell coordinates are pre-computed (line 27) but free x-y-grid coordinates are also possible. Percent text info is right aligned on a white background area of 50 pixels width, at right side of polygonal shape (default).
[Top]
active-color = red inactive-color = orange width = 10 height = 10
[Top]
[Top]
[Top]
Run the script.